By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Ashui.comAshui.comAshui.com
  • Home
    • Bookmarks
    • English
      • News
      • Projects
      • Products
    • Ashui Awards
    • Giới thiệu
    • Quảng cáo / PR
    • Liên hệ
  • Tin tức / Sự kiện
    • Tin trong nước
    • Tin thế giới
    • Sự kiện
    Tin tức / Sự kiệnĐọc tiếp
    Cuộc thi Thiết kế Nhà phố 2025: Nhìn lại không gian sống quen thuộc bằng góc nhìn mới
    ConsMedia 19/05/2025
    Sơn La ban hành Quy chế quản lý kiến trúc đô thị Mộc Châu
    Báo Xây dựng 19/05/2025
    [Cà phê Net Zero] Sống thân thiện với môi trường và bền vững
    Ashui.com 18/05/2025
    Tham vọng của Neom đối mặt thách thức môi trường
    Tạp chí Xây dựng 18/05/2025
    TPHCM điều chỉnh quy hoạch khu đô thị Bình Quới – Thanh Đa
    KTSG Online 17/05/2025
  • Chuyên mục
    • Kiến trúc
    • Nội – ngoại thất
    • Quy hoạch đô thị
    • Bất động sản
    • Năng lượng – Môi trường
    • Phong thủy
  • Công nghệ
    • Công nghệ mới
    • Giải pháp
    • Xu hướng
    • Ứng dụng
  • Vật liệu / Thiết bị
    • Vật liệu xây dựng
    • Trang thiết bị
    • Trang trí nội thất
    • Thị trường
  • Dự án
    • Giới thiệu dự án
    • Tư vấn thiết kế
    • Kinh tế / Pháp luật
  • Tương tác
    • Chuyên đề
    • Góc nhìn
    • Phản biện
    • Đối thoại
    • Q&A
    • Điểm đến
    • Nhìn ra thế giới
  • Cộng đồng
    • Kiến trúc sư
    • Kỹ sư
    • Thiết kế / Sáng tạo
    • Sinh viên
    • Tuyển dụng
    • CLB Điện ảnh Kiến trúc
    • CLB Kiến trúc Xanh TPHCM
Font ResizerAa
Ashui.comAshui.com
Font ResizerAa
  • Home
  • Tin tức / Sự kiện
  • Chuyên mục
  • Công nghệ
  • Vật liệu / Thiết bị
  • Dự án
  • Tương tác
  • Cộng đồng
  • Home
    • Bookmarks
    • English
    • Ashui Awards
    • Giới thiệu
    • Quảng cáo / PR
    • Liên hệ
  • Tin tức / Sự kiện
    • Tin trong nước
    • Tin thế giới
    • Sự kiện
  • Chuyên mục
    • Kiến trúc
    • Nội – ngoại thất
    • Quy hoạch đô thị
    • Bất động sản
    • Năng lượng – Môi trường
    • Phong thủy
  • Công nghệ
    • Công nghệ mới
    • Giải pháp
    • Xu hướng
    • Ứng dụng
  • Vật liệu / Thiết bị
    • Vật liệu xây dựng
    • Trang thiết bị
    • Trang trí nội thất
    • Thị trường
  • Dự án
    • Giới thiệu dự án
    • Tư vấn thiết kế
    • Kinh tế / Pháp luật
  • Tương tác
    • Chuyên đề
    • Góc nhìn
    • Phản biện
    • Đối thoại
    • Q&A
    • Điểm đến
    • Nhìn ra thế giới
  • Cộng đồng
    • Kiến trúc sư
    • Kỹ sư
    • Thiết kế / Sáng tạo
    • Sinh viên
    • Tuyển dụng
    • CLB Điện ảnh Kiến trúc
    • CLB Kiến trúc Xanh TPHCM
Các kênh mạng xã hội
  • Advertise
© 2000-2025 Ashui.com. All Rights Reserved.
News

Big public concern at road proposal U-turn

Ashui.com 20/09/2010
4 phút đọc
SHARE

The Hanoi People’s Committee’s decision to push forward with a 30 kilometre road between Hanoi’s centre and Ba Vi district has been met with public shock.

Previously in the draft masterplan to develop Hanoi to 2030 with a vision to 2050 the Ministry of Construction proposed to move the national administrative centre to Ba Vi district, around 50km from the current centre in Ba Dinh district in the heart of Hanoi. Simultaneously, a link called the West lake-Ba Vi axis would be built to connect the old and new centres.

  • Photo : Thang Long boulevard will partly meet transport demand in western Hanoi

However, controversy among architects, planning experts and associations regarding the movement of administrative centres led the National Assembly to reject the plan last May and it was thought that the fate of the new link would be the same.

In August this year, Hanoi Mayor Nguyen The Thao confirmed in a document sent to the Prime Minister Nguyen Tan Dung that if the new administrative centre was not moved to Ba Vi, then it was meaningless to set up the new road, because it could harm the proposed green corridor.

However, last week the decision turned and now the access road may be built anyway, connecting the West lake with Ba Vi.

The proposal was signed by Thao and sent to the State Committee for Appraisal of the Master Plan for approval. The proposal stated that the road should end at Dong Mo lake, at the foot of Ba Vi mountain.

The proposal was sent at the time the government was considering approving the draft master plan without these two proposals.

However, many disagree with the plan, including Dang Hung Vo, former deputy minister of natural resources and environment. Vo said that the construction was no longer necessary now that the administrative centre would not moved.

Vo added: “I think some investors own land near the roadway and have pressured the committee to move forward with construction.”

As a whole, the draft Master Plan to Develop Hanoi to 2030 with a Vision to 2050 has been hotly debated by local associations.

A week ago, the Vietnam Union of Science and Technology Associations sent a document to the Central Party Office to suggest delaying the approval of this plan. According to the union, the master plan is complex and large with complicated requirements spanning many different fields. And yet, the plan was completed by a foreign consultant over a short time, leaving many problems behind.

“Many issues have been left unsolved. Certain elements are unfeasible and unsuitable to Vietnamese’s circumstances and need to be studied further to avoid negative consequences,” the document reads.

“This master plan must be carefully researched and studied before any decision is issued because it will directly impact the whole community and it could raise many problems with land, projects, environmental conditions, culture and community livelihood.
”

VUSTA is also against the proposal for the link between West lake and Ba Vi. “Hanoi is currently focused on finishing the expansion of Thang Long boulevard and Highway 32, and it also plans to set up a railway linking Lang and Hoa Lac. All of these roads will make a transport system to fully meet the area’s demand,” it said.

By Bich Ngoc 

Có thể bạn cũng quan tâm

Vietnam’s major cities push ahead with green bus revolution

Greening Vietnam: Frasers Property Vietnam’s Ambitious Landmark Developments

HCM City launches massive land reclamation project in Cần Giờ

HCMC seeks public input on merger with Binh Duong, Ba Ria-Vung Tau to form expanded metropolis

Legislative reform simplifies admin for management of atomic energy plans

Bài trước Vật liệu xanh từ mái đến nền
Bài tiếp Thi tuyển ý tưởng quy hoạch và thiết kế đô thị khu trung tâm và Chợ Đà Lạt
Bình luận Bình luận

Bình luận Hủy

Bạn phải đăng nhập để gửi bình luận.

Ad imageAd image

Mới cập nhật

Bộ Xây dựng nghiên cứu sửa đổi, bổ sung hơn 200 định mức xây dựng
Kinh tế / Pháp luật 20/05/2025
Nguồn năng lượng xanh trong khu công nghiệp đã được “cởi trói”?
Góc nhìn 20/05/2025
“Đồ nội thất nhanh” cũng nguy hiểm như thời trang nhanh?
Nội - ngoại thất 20/05/2025
Cuộc thi Thiết kế Nhà phố 2025: Nhìn lại không gian sống quen thuộc bằng góc nhìn mới
Sự kiện 19/05/2025
Sơn La ban hành Quy chế quản lý kiến trúc đô thị Mộc Châu
Tin trong nước 19/05/2025
Một số yếu tố ảnh hưởng đến phát triển bền vững kiến trúc nhà ở các dân tộc thiểu số vùng miền núi phía Bắc
Kiến trúc 19/05/2025
Thành lập hội đồng thẩm định báo cáo tiền khả thi metro Bình Dương – TPHCM
Kinh tế / Pháp luật 19/05/2025
Xem xét bố trí 10.000 tỷ đồng làm Vành đai 4 TP.HCM qua Đồng Nai
Kinh tế / Pháp luật 18/05/2025
[Cà phê Net Zero] Sống thân thiện với môi trường và bền vững
Sự kiện 18/05/2025
Tham vọng của Neom đối mặt thách thức môi trường
Tin thế giới 18/05/2025
- Advertisement -
Ad imageAd image

Xem thêm

News

HCM City moves forward with metro expansion, construction of 2nd metro starts in Dec

TTXVN 30/03/2025
News

New book sheds light on HCM City’s architectural heritage

TTXVN 16/03/2025
News

Real estate developers need to gear up for the next growth phase

Ashui.com 02/03/2025
News

Đà Nẵng financial centre should differentiate itself from others globally: expert

Ashui.com 10/02/2025
© 2000-2025 Ashui.com. All Rights Reserved.
Welcome back!

Sign in to your account

Username hoặc Email của bạn
Mật khẩu

Quên mật khẩu?